Location: Stip, Macedonia
End-user: LUKOIL DOOEL, Macedonia
Fluids: Gasoline, diesel, vapors
Start-up date: 2018
WIG, in partnership with Carbovac, delivered a comprehensive “turn-key” solution. This included the VRU unit, complete installation, pumps, and integration with the existing system.
The following equipment has been used:
The VRU is designed to meet an emission limit requirement of 35 g NMHC/m³.
If you have any requirements or challenges for us, please contact us directly! We are ready to assist you with high-quality services.
Send your query to info@wig.rs