For LUKOIL Macedonia DOOEL Skopje

Location:    Oil terminals Stip, Macedonia

Introduction

Client's request was to reconstruct 4 metering lines in truck loading/unloading facility with minimal shut-down intervals. Scope of the task was to reconstruct metering lines used for the fiscal measurement of oil/petroleum products transferred, in accordance with the relevant legal regulations.

Description

New metering lines were designed to meet requirements and recommendations of applicable standards and regulations, both local and international (MID DIRECTIVE 2014/32/EU, OIML R 117 recommendation, ATEX 94/94/EC standard...). Equipment installed on the metering lines was selected according to Type Approval DE-10-MI005-PTB010 for the measuring system, used for obtaining a local Type Approval Certificate.

The Scope of the Reconstruction:

  • Equipment installed according to MID DIRECTIVE 2014/32/EU and Type Approval DE-10-MI005-PTB010
    • Installation of air separator on four metering lines
    • Installation of mass flow meters on four metering lines
    • Installation of Pt-100 sensors on four metering lines,
    • Installation of flow computer
  • Reconstruction and adjustment of the existing pipeline and installation of new equipment
  • Installation of overfill prevention system in truck tanks
  • Modernization of the Terminal system management - TAS

Planning and preparation process, reconstruction of existing pipelines, cable units, installation of new equipment and management system modernization was executed with a minimal shut-down time of the loading/unloading terminal. The following equipment was installed:

  • Equipment according to MID DIRECTIVE 2014/32/EU and Type approval DE-10-MI005-PTB010
    • Air separator by Hydro-Carbon
    • Mass flow meter KROHNE OPTIMASS 6400 S100, accuracy > ±0,05%
    • Flow computer TOPTECH Multi-Load II with corresponding number of modules for all metering lines within the loading/unloading terminal.
  • Overfill prevention system OPW CIVACON 8800E, with ground verification.

Now, upon the successful completion of the reconstruction, Client’s unloading/loading terminal has modern, high accuracy metering systems, certified both according to European and local regulations and increased safety levels.

We have a solution for your application! Contact us!

Project Details

OUR MAIN ACTIVITIES

Our automation & control solutions range from conceptual design to start-up and commissioning and include control system configuration & integration, safety control systems, remote instrument enclosures (RIEs) & panels enclosure and panels design and traditional automation & control services combined with advanced applications offerings and field construction services

 

WIG offers an independent approach to vendor selection and application.

Our vendor-independent approach allows us to objectively assist in the selection process of the major controls in order to maximize operating efficiency and productivity. Also, as an engineering company, we have the internal knowledge and resources necessary to offer our clients turnkey solutions, from concept to commissioning and startup. Our extensive project management experience, paired with a structured implementation approach and early involvement in the project, can significantly reduce rework and associated costs later in the project.

 

WIG is one of the leading providers, in this part of Europe, of automation & control services, including system engineering, specification, integration and implementation.

Experience matters. We have built a reputation for innovation, quality and value through skillfully engineered automation & control systems to the upstream oil & gas as well as, water&wastewater, food and beverages and refining and chemical industries. We deliver projects to customers schedule, managing multiple and diverse technologies, automation, maintenance and business system integration and lifecycle costs.

 

We in WIG are fully aware that commissioning usually represents a critical stage in the life of a facility. Commissioning process may be considered as a series of vital checks undertaken before actual operation begins. Since the complete commissioning services play an important role in minimizing project risks and achieving performance goals from the very start, our job is to prove the integrity of all systems, identifying and correcting design and construction errors along the way. Our comprehensive approach helps our clients meet a host of challenges; regulatory, safety and environmental compliance; and naturally, operational performance.

We in WIG undertake complete responsibility for commissioning, whether we start in the engineering office, provide expertise in the fabrication yard or mobilize to a remote area.

Our confidence and wide range of options are the result of support and cooperation we have been cultivating for more than 20 years with our Principals and Partners.

We also promote products and represent our principal's interests with an accent to provide comprehensive customers support in instrumentation selection and application, consulting, distribution of products and systems created by our principals and partners. After that stage, we take care of long term genuine spare parts supply and provision of technical documentation and manuals, software tools for operating and maintenance and many other customer related aspects. 

DOWNLOADS

  • HMI Catalog
  •  
  • Metering systems
Solutions are running...

Best choice for Oil & Gas industry since 1993.
 

 

NewsLetter

Subscribe to our newsletter to receive news, updates and new releases by email.
Scroll to Top